Florence County Building Inspections

 
--The contractor should call (843)676-8600, at specified intervals, for required inspections. --Requested inspections will be conducted within 48 hours of the request.
--The Building Inspection Division has a fax machine available for the convenience of forwarding permit applications. The fax number is (843) 676-8613.

Required Inspections

The Building Official, upon the request of the permit holder or their authorized agent, will make the following inspections and will notify the permit holder or their authorized agent of any code violations which must be corrected prior to starting the next phase of construction.

BUILDING

--Foundation inspection: To be made after trenches are excavated and forms erected.
--Pier and curtain wall.
--Floor slab and floor framing.
--Exterior wall before covering.
--Wall tie inspection if brick veneer.
--Frame inspection: To be made after the roof, all framing, fireblocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete.
--Final inspection: To be made after the building is completed and ready for occupancy.

ELECTRICAL

--Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.
--Rough-In inspection: To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall or ceiling membranes.
--Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

PLUMBING

--Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.
--Rough-In inspection: To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes.
--Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.
NOTE: See Section P312 of the Standard Plumbing Code for required tests.  
 